3.7.6.2 Preheat Coil

90.1-2016 BM

The baseline system shall be modeled with a preheat coil controlled to a fixed setpoint 20°F less than the design room heating temperature setpoint.

 

Preheat Coil Capacity

Applicability

Systems with a preheat coil located in the outside air stream

Definition

The heating capacity of a preheating coil at design conditions.

Units

Btu/h

Input Restrictions

As designed

Baseline Rules

For baseline systems 5 through 8, the baseline system shall be modeled with a preheat coil controlled to a fixed setpoint of 20 °F less than the design room heating setpoint. See G3.1.3.19.

 

Preheat Coil Type

Applicability

Systems with a preheat coil located in the outside air stream

Definition

The heating source of a preheating coil. The choices are:

  • electric resistance
  • gas furnace
  • hydronic (supplied by boiler)

Units

List (see above)

Input Restrictions

As designed

Baseline Rules

The heating source for the baseline preheat coil shall be the same as the baseline system. For baseline systems, 5 and 7, the preheat coils will be hydronic. Buildings with baseline system 6 and 8 will be modeled with electric resistance preheat coils.

 

Preheat Coil Efficiency

Applicability

Systems with a gas preheat coil

Definition

The heating efficiency of a preheating coil at design conditions

Units

Unitless

Input Restrictions

As designed, default is 80%

Baseline Rules

Not applicable. Baseline building would have preheat coils only for systems 5-8 which would either be electric resistance or hydronic.

90.1-2019

For systems 5 through 8, the baseline will be modeled with preheat coil in the mixed air stream controlled to a fixed setpoint 20°F less than the design zone heating temperature setpoint

 

Preheat Coil Capacity

Applicability

Proposed buildings with preheat coils and baseline systems 5 through 8

Definition

The heating capacity of a preheating coil at design conditions

Units

Btu/h

Input Restrictions

As designed

Baseline Building

For baseline systems 5 through 8, the baseline will be modeled with preheat coil controlled to a fixed setpoint 20°F less than the design zone heating temperature setpoint. If there are multiple zone heating setpoints, the preheat setpoint will be determined by the zone with the highest heating temperature setpoint.

The preheat coil capacity will be oversized by 25%. Sizing calculations shall be based on the heating design day and cooling design day conditions, as defined in Section 3.2.3 of this document. Oversizing would be carried out at zone level where the sizing parameters would be applied to the zone design’s heating coil loads.

 

Preheat Coil Type

Applicability

Baseline systems 5 through 8

Definition

The heating source of a preheating coil. The preheat coil could be electric resistance, gas fired, or a hydronic heating coil.

Units

List: Electric Resistance, Gas Fired, Hydronic

Input Restrictions

As designed

Baseline Building

The heating source for baseline systems 5 and 7 will be hydronic. Buildings with baseline systems 6 and 8 will be modeled with electric resistance preheat coils.

 

Preheat Coil Efficiency

Applicability

Systems with a preheat coil with gas heating

Definition

The heating efficiency of a preheating coil at design conditions

Units

Percentage

Input Restrictions

As designed

Baseline Building

Not applicable. Baseline building would have preheat coils only for systems 5 through 8 that would either be electric resistance or hydronic.

90.1-2022

For Standard 90.1-2022 Section G3.2 systems 5 through 8, the baseline will be modeled with preheat coil in the mixed air stream controlled to a fixed setpoint 20°F less than the design zone heating temperature setpoint.

For Standard 90.1-2022 Section G3.3, a preheat coil is modeled in the baseline if there is a preheat coil in the proposed design.

 

Preheat Coil Capacity

Applicability

Proposed buildings with preheat coils and baseline systems 5 through 8

Definition

The heating capacity of a preheating coil at design conditions

Units

Btu/h

Input Restrictions

As designed

Baseline Building

G3.2 New Construction/Major Alterations

For baseline systems 5 through 8, the baseline will be modeled with preheat coil controlled to a fixed setpoint 20°F less than the design zone heating temperature setpoint. If there are multiple zone heating setpoints, the preheat setpoint will be determined by the zone with the highest heating temperature setpoint.

The preheat coil capacity will be oversized by 25%. Sizing calculations shall be based on the heating design day and cooling design day conditions, as defined in Section 3.2.3 of this document. Oversizing would be carried out at zone level where the sizing parameters would be applied to the zone design’s heating coil loads.

G3.3 Minor Alterations

The baseline shall be modeled with a preheat coil if there is a preheat coil specified in the proposed. Baseline shall be modeled such that the preheat coils have controls that stop their heat output whenever mechanical cooling, including economizer operation, is occurring.

Exception: the preheat setpoint should be modeled the same in the baseline and proposed if, based on the requirements of 90.1-2022 Section 6.1.4 and the scope of the alteration, 90.1-2022 Section 6.5.2.5 requirements are inapplicable.

Preheat coil capacity for the baseline design shall be sized proportionally to the capacities in the proposed design based on sizing runs—i.e., the ratio between the capacities used in the annual simulations and the capacities determined by the sizing runs shall be the same for both the proposed design and baseline building design.

 

Preheat Coil Type

Applicability

Baseline systems 5 through 8

Definition

The heating source of a preheating coil. The preheat coil could be electric resistance, gas fired, or a hydronic heating coil.

Units

List: Electric Resistance, Gas Fired, Hydronic

Input Restrictions

As designed

Baseline Building

G3.2 New Construction/Major Alterations

The heating source for baseline systems 5 and 7 will be hydronic. Buildings with baseline systems 6 and 8 will be modeled with electric resistance preheat coils.

G3.3 Minor Alterations

Same as the proposed design.

 

Preheat Coil Efficiency

Applicability

Systems with a preheat coil with gas heating

Definition

The heating efficiency of a preheating coil at design conditions

Units

Percentage

Input Restrictions

As designed

Baseline Building

G3.2 New Construction/Major Alterations

Not applicable. Baseline building would have preheat coils only for systems 5 through 8 that would either be electric resistance or hydronic.

G3.3 Minor Alterations

All preheat coil equipment in the baseline building design that is included in the scope of the alteration shall be modeled at the minimum efficiency levels, both part load and full load, in accordance with Sections 6.4. Where the efficiency rating includes supply fan energy, calculate the minimum COPnfheating using the equation from Standard 90.1-2022 Section 12.5.2(c) as applicable. Where multiple HVAC zones or residential spaces are combined into a single thermal block, the efficiencies for baseline HVAC systems should be based on the equipment capacity of the thermal block divided by the number of HVAC zones or residential spaces.