These spreadsheets support the software tests to verify that the baseline building is created correctly and that the right default assumptions are applied to both the rated building model and the baseline building model.
Summary of Tests | List of tests to be performed for the various prototype buildngs. |
Test Results | A form for entering test results for candidate software. |