Purpose |
|
---|---|
Applicability |
All Projects |
Definition |
The purpose for which the COMNET modeling procedure is used: |
Units |
List of COMNET supported purposes |
Input Restrictions |
Compulsory input |
Baseline Rules |
The definition of the baseline building is derived from this input, when applicable. |
Building Type |
||||||||||
---|---|---|---|---|---|---|---|---|---|---|
Applicability |
All Projects |
|||||||||
Definition |
A building type which is used to determine the performance cost Index target. |
|||||||||
Units |
Choose from the following list:
|
|||||||||
Input Restrictions |
Compulsory input |
|||||||||
Baseline Rules |
This choice sets the baseline building performance target for the project. |
Building Area Classification |
|
---|---|
Applicability |
When the whole building area method is used instead of the space-by-space method of classifying activity in the building |
Definition |
The building type or principal activity. One of two available classification methods for identifying the function of the building or the functions of spaces within the building, which in turn determine energy-related requirements for the baseline building. Appendix B lists the building classifications that are available under the building area method. |
Units |
List: Choose a building activity from Appendix B or select “Space-by-Space” if the space-by-space method is used. |
Input Restrictions |
For multi-use buildings, the building may be divided and a different building classification may be assigned to each part. Either the building classification method or the space-by-space classification method must be used, but the two classification methods may not be mixed within a single rating. |
Baseline Rules |
Same as the proposed design |
Building Type |
|
Applicability |
All Projects |
Definition |
A building type which is used to determine the performance cost index target. |
Units |
List: Choose from the following list Multifamily Healthcare/Hospital Hotel/Motel Office Restaurant Retail School Warehouse Grocery Store All Others |
Input Restrictions |
Required input |
Baseline Building |
Same as proposed. This choice would determine the baseline performance target for the project. |
Building Classification for Lighting |
||||||||||||||||||||||||||||||||||
Applicability |
When the building area method is used instead of the space-by-space method of classifying lighting in the building |
|||||||||||||||||||||||||||||||||
Definition |
The building type or principal activity. One of two available classification methods for identifying the function of the building or the functions of spaces within the building, which in turn determine lighting-related requirements for the baseline building. Table 9 lists the building classifications that are available under the building area method. Table 9. Building Area Types for Standard 90.1-2019
|
|||||||||||||||||||||||||||||||||
Units |
List: Choose a building activity from Table 9 |
|||||||||||||||||||||||||||||||||
Input Restrictions |
For multi-use buildings, the building may be divided and a different building classification may be assigned to each part. Either the building area method or the space-by-space method must be used, but the two classification methods may not be mixed for lighting definitions within a single PRM run. |
|||||||||||||||||||||||||||||||||
Baseline Building |
Same as proposed |