90.1-2019
Where power and other systems covered by Standard 90.1-2019 Sections 8 and 10 are not submitted with design documents, these systems are required to comply with but not exceed the requirements specified in those sections.
90.1-2022
Where power and other systems covered by Standard 90.1-2022 Sections 8 and 10 are not submitted with design documents, these systems are required to comply with but not exceed the requirements specified in those sections.