| Heat Recovery Name | |
| Applicability | All heat recovery systems |
|---|---|
| Definition | A name assigned to a heat recovery system. This would provide a link to the construction documents. |
| Units | Text, unique |
| Input Restrictions | As designed |
| Baseline Rules | No heat recovery systems |
| Heat Recovery Device Type | |
| Applicability | All heat recovery systems |
|---|---|
| Definition | The type of heat recovery equipment. Choices include:
|
| Units | List (see above) |
| Input Restrictions | As designed |
| Baseline Rules | Heat recovery systems are not included in the baseline system. |
| Heat Recovery Loads | |
| Applicability | All heat recovery systems |
|---|---|
| Definition | The loads met by the heat recovery system. Choices include:
|
| Units | List (see above) |
| Input Restrictions | As designed |
| Baseline Rules | Not required in the baseline system. |
|
Heat Recovery Name |
|
|---|---|
|
Applicability |
All heat recovery systems |
|
Definition |
A name assigned to a heat recovery system. This would provide a link to the construction documents. |
|
Units |
Text, unique |
|
Input Restrictions |
As designed |
|
Baseline Rules |
No heat recovery systems |
|
Heat Recovery Device Type |
|
|---|---|
|
Applicability |
All heat recovery systems |
|
Definition |
The type of heat recovery equipment. Choices include:
|
|
Units |
List (see above) |
|
Input Restrictions |
As designed |
|
Baseline Rules |
The baseline building is modeled with a condenser heat recovery system for service water heating, when all of the following conditions are true:
The required heat recovery system for the baseline building, shall have the capacity to provide the smaller of:
If the simulation software is not capable of modeling the requirements described, the requirement for providing such a system in the proposed building shall be met as a prescriptive requirement and heat recovery shall not be modeled in the baseline or proposed building designs. |
|
Heat Recovery Loads |
|
|---|---|
|
Applicability |
All heat recovery systems |
|
Definition |
The loads met by the heat recovery system. Choices include:
More than one load may be selected. |
|
Units |
List (see above) |
|
Input Restrictions |
As designed |
|
Baseline Rules |
Service water heating when required as described above |
|
Condenser Heat Recovery Effectiveness |
|
|---|---|
|
Applicability |
Systems that use recover heat from a condenser |
|
Definition |
The percentage of heat rejection at design conditions from a DX or heat pump unit in cooling mode that is available for space or water heating |
|
Units |
Percent (%) |
|
Input Restrictions |
As designed. The software must indicate that supporting documentation is required on the output forms if heat recovery is specified. |
|
Baseline Rules |
Same as the proposed |
|
Condenser Heat Recovery Use |
|
|---|---|
|
Applicability |
Systems that use heat recovery |
|
Definition |
The end use of the heat recovered from a DX or heat pump unit. The choices are:
|
|
Units |
List (see above) |
|
Input Restrictions |
As designed. The software must indicate that supporting documentation is required on the output forms if heat recovery is specified. |
|
Baseline Rules |
Not applicable for most conditions. The end use will be water heating if required for 24-hour facility operation. |
Requirements related to exhaust air recovery are documented in Section 3.7.6.6 of this manual.
|
Heat Recovery Name |
|
|---|---|
|
Applicability |
All heat recovery systems |
|
Definition |
A name assigned to a heat recovery system. This would provide a link to the construction documents. |
|
Units |
Text, unique |
|
Input Restrictions |
As designed |
|
Baseline Building |
Same as proposed |
|
Heat Recovery Device Type |
|
|---|---|
|
Applicability |
All heat recovery systems |
|
Definition |
The type of heat recovery equipment. Choices include:
|
|
Units |
List (see above) |
|
Input Restrictions |
As designed |
|
Baseline Building |
The baseline building is modeled with a condenser heat recovery system for service water heating, when all of the following conditions are true:
The required heat recovery system for the baseline building, shall have the capacity to provide the smaller of:
If the simulation software is not capable of modeling the requirements described, the requirement for providing such a system in the proposed building shall be met as a prescriptive requirement and heat recovery shall not be modeled in the baseline or proposed building designs. |
|
Heat Recovery Loads |
|
|---|---|
|
Applicability |
All heat recovery systems |
|
Definition |
The loads met by the heat recovery system. Choices include:
More than one load may be selected. |
|
Units |
List (see above) |
|
Input Restrictions |
As designed |
|
Baseline Building |
Service water heating when required as described above |
|
Condenser Heat Recovery Effectiveness |
|
|---|---|
|
Applicability |
Systems that use recover heat from a condenser |
|
Definition |
The percentage of heat rejection at design conditions from a DX or heat pump unit in cooling mode that is available for space or water heating |
|
Units |
Percent (%) |
|
Input Restrictions |
As designed. The software must indicate that supporting documentation is required on the output forms if heat recovery is specified. |
|
Baseline Building |
Same as proposed |
|
Condenser Heat Recovery Use |
|
|---|---|
|
Applicability |
Systems that use heat recovery |
|
Definition |
The end use of the heat recovered from a DX or heat pump unit. The choices are:
|
|
Units |
List (see above) |
|
Input Restrictions |
As designed. The software must indicate that supporting documentation is required on the output forms if heat recovery is specified. |
|
Baseline Building |
Not applicable for most conditions. The end use will be water heating if required for 24-hour facility operation. |
Requirements related to exhaust air recovery are documented in Section 3.7.6.6 of this manual.
|
Heat Recovery Name |
|
|---|---|
|
Applicability |
All heat recovery systems |
|
Definition |
A name assigned to a heat recovery system. This would provide a link to the construction documents. |
|
Units |
Text, unique |
|
Input Restrictions |
As designed |
|
Baseline Building |
Same as proposed |
|
Heat Recovery Device Type |
|
|---|---|
|
Applicability |
All heat recovery systems |
|
Definition |
The type of heat recovery equipment. Choices include:
|
|
Units |
List (see above) |
|
Input Restrictions |
As designed |
|
Baseline Building |
G3.2 New Construction/Major Alterations The baseline building is modeled with a condenser heat recovery system for service water heating, when all of the following conditions are true:
The required heat recovery system for the baseline building, shall have the capacity to provide the smaller of:
If the simulation software is not capable of modeling the requirements described the requirement for providing such a system in the proposed building shall be met as a prescriptive requirement and heat recovery shall not be modeled in the baseline or proposed building designs. G3.3 Minor Alterations If Standard 90.1-2022 Sections 6.5.6.2 and/or 6.5.6.3 are applicable based on the scope of the alteration and the language in Standard 90.1-2022 Section 6.1.4 then the baseline shall be modeled with heat recovery according to the requirements in these Standard 90.1-2022 sections which are explained in detail directly below. Requirements of Standard 90.1-2022 Section 6.5.6.2: The baseline building is modeled with a condenser heat recovery system for service water heating, when all of the following conditions are true:
The required heat recovery system for the baseline building, shall have the capacity to provide the smaller of:
Exceptions to 90.1 6.5.6.2:
Requirements of Standard 90.1-2022 Section 6.5.6.3: Where heating water is used for space heating, a heat-pump chiller meeting the requirements of Table 6.8.1-16 for heat recovery that uses the cooling system return water as the heat source shall be modeled in the baseline, provided all of the following are true:
The modeled heat recovery system shall have a cooling capacity that is at least 7% of the total design chilled-water capacity of the acute inpatient hospital at peak design conditions. Exception to 90.1 6.5.6.3: Buildings in Climate Zones 5C, 6B, 7, and 8. Otherwise, heat recovery devices should be modeled identically in the baseline and proposed.
|
|
Heat Recovery Loads |
|
|---|---|
|
Applicability |
All heat recovery systems |
|
Definition |
The loads met by the heat recovery system. Choices include:
More than one load may be selected. |
|
Units |
List (see above) |
|
Input Restrictions |
As designed |
|
Baseline Building |
G3.2 New Construction/Major Alterations Service water heating when required as described above. G3.3 Minor Alterations Space heating and/ or service water heating when required as described under the Heat Recovery Device Type descriptor. |
|
Condenser Heat Recovery Effectiveness |
|
|---|---|
|
Applicability |
Systems that use recover heat from a condenser |
|
Definition |
The percentage of heat rejection at design conditions from a DX or heat pump unit in cooling mode that is available for space or water heating |
|
Units |
Percent (%) |
|
Input Restrictions |
As designed. The software must indicate that supporting documentation is required on the output forms if heat recovery is specified. |
|
Baseline Building |
Same as proposed. Where no system exists in the proposed but is required to be modeled in the baseline model. There are no restrictions other than modeling the system as minimally compliant with Standard 90.1-2022 Sections 6.5.6.2 and/or 6.5.6.3 as applicable based on the scope of the alteration and the language in Standard 90.1-2022 Section 6.1.4. See the Heat Recovery Device Type descriptor for detailed requirements. |
|
Condenser Heat Recovery Use |
|
|---|---|
|
Applicability |
Systems that use heat recovery |
|
Definition |
The end use of the heat recovered from a DX or heat pump unit. The choices are:
|
|
Units |
List (see above) |
|
Input Restrictions |
As designed. The software must indicate that supporting documentation is required on the output forms if heat recovery is specified. |
|
Baseline Building |
G3.2 New Construction/Major Alterations The end use will be water heating if required for 24-hour facility operation. G3.3 Minor Alterations The end use will be service water heating and/or space heating if required. |
| Heat Recovery Name | |
| Applicability | All heat recovery systems |
|---|---|
| Definition | A name assigned to a heat recovery system. This would provide a link to the construction documents. |
| Units | Text, unique |
| Input Restrictions | As designed |
| Heat Recovery Device Type | |
| Applicability | All heat recovery systems |
|---|---|
| Definition | The type of heat recovery equipment. Choices include:
|
| Units | List (see above) |
| Input Restrictions | As designed |
| Heat Recovery Loads | |
| Applicability | All heat recovery systems |
|---|---|
| Definition | The loads met by the heat recovery system. Choices include:
|
| Units | List (see above) |
| Input Restrictions | As designed |
| Heat Recovery Name | |
| Applicability | All heat recovery systems |
|---|---|
| Definition | A name assigned to a heat recovery system. This would provide a link to the construction documents. |
| Units | Text, unique |
| Input Restrictions | As designed |
| Heat Recovery Device Type | |
| Applicability | All heat recovery systems |
|---|---|
| Definition | The type of heat recovery equipment. Choices include:
|
| Units | List (see above) |
| Input Restrictions | As designed |
| Heat Recovery Loads | |
| Applicability | All heat recovery systems |
|---|---|
| Definition | The loads met by the heat recovery system. Choices include:
|
| Units | List (see above) |
| Input Restrictions | As designed |