Humidifier Type |
|
|---|---|
|
Applicability |
Optional humidifier |
|
Definition |
The type of humidifier employed. Choices include:
|
|
Units |
List (see above) |
|
Input Restrictions |
As designed |
|
Baseline Building |
For systems serving zones where humidification is included in the proposed design, the baseline shall include the same humidifier type unless the proposed humidifier does not include automatic shutoff valves and insulated dispersion tubes meeting the requirements of 90.1-2019 Section 6.5.2.4. In that case, adiabatic humidification shall be used in the baseline. In either case, the baseline humidification system uses the same schedule and setpoints as the proposed building. |
|
Humidistat Maximum Setting |
|
|---|---|
|
Applicability |
Systems with humidity control |
|
Definition |
The control setpoint for dehumidification |
|
Units |
Percent (%) |
|
Input Restrictions |
As designed |
|
Baseline Building |
If the proposed design HVAC system(s) have humidistatic controls, then the baseline building design shall use mechanical cooling for dehumidification and shall have reheat available to avoid overcooling. Systems serving computer rooms shall not have reheat for dehumidification. The reheat type shall be the same as the system heating type. Only 25% of the system reheat energy shall be included in the baseline building performance, when the baseline building doesn’t comply with any of the exceptions listed below (Standard 90.1-2019 Section 6.5.2.3). The requirements and exceptions to the same are listed below- Humidity controls shall prevent reheating, mixing of hot and cold airstreams, or other means of simultaneous heating and cooling of the same airstream. Exceptions :
|
|
Humidistat Minimum Setting |
|
|---|---|
|
Applicability |
Systems with humidity control |
|
Definition |
The control setpoint for dehumidification |
|
Units |
Percent (%) |
|
Input Restrictions |
As designed |
|
Baseline Building |
Same as proposed |
|
Humidifier Type |
|
|---|---|
|
Applicability |
Optional humidifier |
|
Definition |
The type of humidifier employed. Choices include:
|
|
Units |
List (see above) |
|
Input Restrictions |
As designed |
|
Baseline Building |
G3.2 New Construction/Major Alterations For systems serving zones where humidification is included in the proposed design, the baseline shall include the same humidifier type unless the proposed humidifier does not include automatic shutoff valves, insulated dispersion tubes meeting the requirements of 90.1-2022 Section 6.5.2.4. In that case, adiabatic humidification shall be used in the baseline. In either case, the baseline humidification system uses the same schedule and setpoints as the proposed building. G3.3 Minor Alterations Same as proposed in accordance with 90.1-2022 Section 6.4.3.6.2 requirements which are that humidistatic controls shall not use fossil fuel or electricity to produce relative humidity above 30% in the warmest zone served by the system. |
|
Humidistat Maximum Setting |
|
|---|---|
|
Applicability |
Systems with humidity control |
|
Definition |
The control setpoint for dehumidification |
|
Units |
Percent relative humidity (%) |
|
Input Restrictions |
As designed |
|
Baseline Building |
G3.2 New Construction/Major Alterations If the proposed design HVAC system(s) have humidistatic controls, then the baseline building design shall use mechanical cooling for dehumidification and shall have reheat available to avoid overcooling. Systems serving computer rooms shall not have reheat for dehumidification. The reheat type shall be the same as the system heating type. Only 25% of the system reheat energy shall be included in the baseline building performance, when the baseline building does not comply with any of the exceptions listed below (Standard 90.1-2022 Section 6.5.2.3). The requirements and exceptions to the same are listed below- Humidity controls shall prevent reheating, mixing of hot and cold airstreams, or other means of simultaneous heating and cooling of the same airstream. Exceptions :
G3.3 Minor Alterations Same as proposed in accordance with 90.1-2022 Section 6.4.3.6.1 requirements which are that mechanical cooling shall not be used to reduce humidity below the lower of a dew point of 55°F or relative humidity of 60% in the coldest zone served by the system except when systems serving zones where humidity levels are required to be maintained with precision of not more than ±5% rh to comply with applicable codes or accreditation standards or as approved by the authority having jurisdiction. Exception: the baseline and proposed should be modeled identically if, based on the requirements of 90.1-2022 Section 6.1.4 and the scope of the alteration, 90.1-2022 Section 6.4.3.6.1 requirements are inapplicable. |
|
Humidistat Minimum Setting |
|
|---|---|
|
Applicability |
Systems with humidity control |
|
Definition |
The control setpoint for dehumidification |
|
Units |
Percent relative humidity (%) |
|
Input Restrictions |
As designed |
|
Baseline Building |
G3.2 New Construction/Major Alterations Same as proposed G3.3 Minor Alterations Same as proposed in accordance with 90.1-2022 Section 6.4.3.6.2 requirements which are that humidistatic controls shall not use fossil fuel or electricity to produce relative humidity above 30% in the warmest zone served by the system. |