This object can be used to define the name of the tariff, the type of tariff, and other details about the overall tariff.
Tariff Name |
|
Applicability |
All projects using custom utility rates |
Definition |
A unique identifier for the tariff being calculated. The name is used in identifying the output results and in associating all of the charges and other objects that make up a tariff. |
Units |
Text |
Input Restrictions |
None |
Baseline Building |
Same as proposed |
Tariff Meter |
|
Applicability |
All projects using custom utility rates |
Definition |
Specifies the type of meter the tariff will accept to calculate energy used or demand:
|
Units |
List of all the output meters mentioned above |
Input Restrictions |
None |
Baseline Building |
Same as proposed |
Net Metering Option |
|
Applicability |
All projects using custom utility rates |
Definition |
This input sets whether the specified tariff is used for buying, selling or both to the utility. The choices are:
|
Units |
List: Buy From Utility, Sell To Utility, Net Metering |
Input Restrictions |
None. The default selection for this input is Buy From Utility. |
Baseline Building |
Same as proposed |
Conversion Factors |
|||||||||||||||||||||||||
Applicability |
All projects using custom utility rates |
||||||||||||||||||||||||
Definition |
A choice that allows several different predefined conversion factors to be used. These multipliers are used to convert energy and/or demand into the units specified by the utility in their tariff.
The following table shows the conversion factors for each of the units. The simulation results for energy use are in joules (J) and energy demand are in watts (W). The conversion factors specified below are used to convert energy and demand to the corresponding unit.
|
||||||||||||||||||||||||
Units |
List of the unit choice or user defined |
||||||||||||||||||||||||
Input Restrictions |
One of the units defined in the list. If “User Defined” is selected, the corresponding energy and demand conversion factor needs to be provided. |
||||||||||||||||||||||||
Baseline Building |